WestCoastPaddler.com

 Home / About  Paddling Locations Gallery  Kayak and Accessory Building  Desktop Wallpaper Images  Community

> Building Kayaks and Kayak Accessories > Building the Bear Mountain Enterprise

Attaching blocks to the table
I drew lines perpendicular to the center line as per the distances shown in the drawings and set up 1 1/2" x 1 1/2" blocks on each of those lines. The blocks will hold the forms in place. I pre-drilled 3 holes in each of the blocks, then after clamping in location, screwed each block into the table.
---

There is an ongoing discussion about this build in our forums in the "Boat and Accessory Building" section. If you have any questions or comments, please post them in the thread titled "Bear Mountain Enterprise - Building Q&A"
IMG_5353.jpg IMG_5355.jpg IMG_5357.jpg