Building the Bear Mountain Enterprise |
 |
 |
|

Project Description / Boat Specs1180 views
|
|

Building the work table1194 views
|
|

Guidelines drawn on station forms1244 views
|
|

Attaching form extensions1093 views
|
|

Hull panels1025 views
|
|

Packing tape applied980 views
|
|

Rolled glass978 views
|
|

Preparing for the application952 views
|
|

Clamps on the joints919 views
|
|

Glued joints940 views
|
|

Matching panels829 views
|
|

Uh oh...943 views
|
|

Attaching blocks to the table828 views
|
|

Lining up with a string line839 views
|
|

Oops899 views
|
|

Everything lines up943 views
|
|

First glimpse of the boat935 views
|
|

Gluing bow and stern stems853 views
|
|

Smoothing things over823 views
|
|

Bevelling the bow stem840 views
|
|

Stern stem bevelled829 views
|
|

TIP: Cutting wires829 views
|
|

TIP: Making sutures832 views
|
|

Preparing planks929 views
|
|
| 217 files on 10 page(s) |
 |
1 |  |
 |
 |
 |
 |
 |
 |
 |
 |
|