Building the Bear Mountain Enterprise |
 |
 |
|

Project Description / Boat Specs1088 views
|
|

Building the work table1088 views
|
|

Guidelines drawn on station forms1132 views
|
|

Attaching form extensions1001 views
|
|

Hull panels931 views
|
|

Packing tape applied895 views
|
|

Rolled glass895 views
|
|

Preparing for the application869 views
|
|

Clamps on the joints839 views
|
|

Glued joints854 views
|
|

Matching panels751 views
|
|

Uh oh...850 views
|
|

Attaching blocks to the table747 views
|
|

Lining up with a string line756 views
|
|

Oops810 views
|
|

Everything lines up846 views
|
|

First glimpse of the boat835 views
|
|

Gluing bow and stern stems763 views
|
|

Smoothing things over731 views
|
|

Bevelling the bow stem756 views
|
|

Stern stem bevelled744 views
|
|

TIP: Cutting wires734 views
|
|

TIP: Making sutures743 views
|
|

Preparing planks835 views
|
|
| 217 files on 10 page(s) |
 |
1 |  |
 |
 |
 |
 |
 |
 |
 |
 |
|